Services

Bathroom renovation and leak repair in Jakarta

Bathroom renovation without the drama: tested waterproofing, 5-year structural warranty

From IDR 15M/package · Contact us to schedule a site survey · Pay by progress

See the price tableSee catalogue package

Contact us to schedule a site survey

PT Mitra Gusnita Nanda · NIB 9120017080411 · 5-year structural warranty

Modern bathroom with a glass shower screen, light grey tiles and a timber vanity

Bathroom renovation cost

Indicative package prices for a bathroom of about 4 m² are in the table on this page: Standard, Premium, and Signature. Figures exclude VAT and stay indicative until the site visit is done. If you only need a wet-area membrane refresh, a per-m² waterproofing add-on is available from the catalogue. Also compare the bathroom renovation cost guide to understand what usually moves the budget: area, strip-out depth, slab condition, sanitary brands, and whether walls or the ceiling are included.

  • StandardIDR 15M / package
  • PremiumIDR 25M / package
  • SignatureIDR 42M / package

Wet-area waterproofing refresh add-on: IDR 95,000/m² (Standard rate).

See the bathroom package in the catalogue

Send a bathroom renovation request

Leave your name, WhatsApp or email, and a few words about the job. The MEETS team will get back to you to schedule a site survey.

Leaking or damp bathroom? Fix it at the source

Bathroom renovations almost always start from the same problems: damp on a neighbour's wall, a blistering floor, cracked tiles, or drains that keep clogging. In Greater Jakarta, many existing bathrooms are decades old with thinning waterproofing, worn fittings, and ventilation that no longer keeps up. MEETS delivers bathroom renovation as a measurable catalogue package, then adjusts scope after inspecting your building. The service covers homes in Greater Jakarta and other major Indonesian cities.

Scope of work

  • Selective strip-out based on existing conditions (not automatic full demolition).
  • Wet-area waterproofing, falls to the floor drain, and drain adjustments when needed.
  • Sanitaryware, vanity, and floor/wall finishes per package tier.
  • Coordination of bathroom water and power points within the agreed scope.

Leaking bathroom? Waterproofing that gets tested

Wet areas are the most common source of leaks. MEETS emphasises a checkable work sequence, not only finishes that look tidy.

  • Waterproofing coating or membrane on wet areas (floors and walls as scoped).
  • Flood / soak test for 24–48 hours before final finishes go on.
  • Floor falls directed to the floor drain so water does not pond.
  • Joints, floor drains, and pipe penetrations are checked so leaks are less likely to return.

How we work

  1. Consultation on symptoms, priorities, and bathroom budget.
  2. Site visit of existing waterproofing, drains, and ventilation.
  3. Quote with agreed scope and specification tier.
  4. Wet-area works, testing, finishes, then handover.

Payment & warranty

30% down payment at contract, then billing at each 25% of physical progress. Structure warranty 5 years; finishes and installations 2 years.

Read full terms

Long-term results hinge on the wet-area sequence. A waterproofing coating or membrane is installed as scoped, then checked with a 24–48 hour soak or flood test before final finishes. Floor falls are directed to the floor drain so water does not pond in corners. Joints, pipe penetrations, and drain positions are rechecked because that is where leaks most often return. Skipping the test to rush finishes is a risk that usually comes back within months.

Materials affect both price and daily upkeep. The Standard package typically uses local ceramics and fittings with parts that are easy to replace. Premium steps up granite, fixtures, rain showers, and vanity quality. Signature uses larger slabs or more custom finishes, including wall-hung WC and tempered glass options when they are in specification. Pick a tier by how often the room is used, the age of the building, and whether it is the primary or guest bathroom. Do not compare moodboard photos alone without checking the specification behind the tile and behind the wall.

Programme length depends on area, strip-out depth, and whether wall or slab repairs are needed. Catalogue packages give an early range; a firm schedule is set after the site visit. During works, water access and material routes in a lived-in home need planning so other rooms stay usable. That coordination is agreed at quote, including working hours in a cluster or apartment building when local rules apply. Homes that stay occupied usually need a temporary bathroom arrangement or a staggered wet-room schedule.

Common issues we see: leaks to the floor below in two-storey homes, damp on lightweight block walls, clogged drains from wrong falls, grout that has started absorbing water, and poor ventilation that feeds mould in corners. Replacing tiles alone rarely fixes this. Drains, falls, waterproofing, and exhaust or ventilation belong in scope when existing conditions are weak. If you only want a vanity swap without opening the floor, say so in the brief so the estimate does not overshoot and the crew does not open areas you do not need.

For upstairs bathrooms, extra attention goes to the slab and vertical pipe runs. Drips on the ceiling below often come from floor-drain joints or hairline cracks that only show after selective strip-out. Site visit helps decide whether a local repair is enough or a wider opening is required. In older houses, iron or PVC runs that have narrowed are also common sources of odour and slow flow, so pipe section replacements may enter the quote once conditions are visible.

Quick tips before you chat: gather photos from several angles (floor, walls, ceiling, floor drain, and the area below if there is a leak), approximate length and width, and the symptoms (odour, mould, dripping, or cold damp walls). Note whether the bathroom is upstairs and whether the home stays occupied during works. Contact us to schedule a site survey to help lock specification before the final quote. MEETS also serves other major Indonesian cities.

Other cost factors that often appear after strip-out: repairing a ceiling that has already taken water, replacing a rotten bathroom door frame, adjusting floor height to meet the corridor cleanly, and adding lighting points or a mirror cabinet. Each item can sit inside or outside scope depending on budget priorities. It is better to lock must-haves early than to add uncontrolled dayworks mid-project.

If the bathroom shares space with a small laundry zone, keep wet and dry zones from damaging each other. A washing machine needs water, drainage, and power that stay safe from splash. Site visit helps separate what belongs in the bathroom package from what is better priced as a separate add-on so the figure stays transparent.

Homeowners often delay bathroom work because they fear the house will stay messy for too long. With a clear scope after the site visit, the crew can focus on one wet room without opening the whole floor plate. Progress updates and material decisions (tiles, sanitaryware, paint) are scheduled so you are not guessing mid-project. That keeps renovation manageable even while the home stays occupied.

After the site visit, the quote itemises scope, material tier, and work sequence. Payment follows the construction project scheme: down payment at contract, then billing by physical progress. Structure warranty plus finishes and installations follow the same terms as MEETS home renovation. Full terms are on the terms page if you want to read the detail before deciding.

For a wider home renovation, see the home renovation service page. If you only need the bathroom, start from the bathroom renovation catalogue package, read the bathroom renovation cost guide, or send your location on WhatsApp with the prefill above. The portfolio below shows related residential and renovation work, not offices, hotels, or commercial facilities, so visual references stay relevant to homes.

Frequently asked questions

How much does bathroom renovation cost at MEETS?

Catalogue packages for a bathroom of about 4 m²: Standard IDR 15M, Premium IDR 25M, Signature IDR 42M per package (excl. VAT). Final pricing after the site visit. Wet-area waterproofing add-on from IDR 95,000/m² (Standard).

Is waterproofing always tested before finishes?

Yes, for wet-area work in bathroom renovation scope: a 24–48 hour soak or flood test is done before final finishes, following the agreed work sequence.

What causes a bathroom to leak into the room below?

Most often a floor-drain joint, a hairline crack in the slab, waterproofing that has worn thin, or floor falls that let water pond in a corner. The source often only shows after selective strip-out, so the site visit decides whether a local repair is enough or a wider area has to be opened.

Can a leaking bathroom be fixed without a full renovation?

Yes, when conditions allow. The catalogue wet-area waterproofing refresh add-on is Standard IDR 95,000/m², Premium IDR 160,000/m², Signature IDR 250,000/m² (excl. VAT). After the site visit, the team confirms whether a local repair is enough or finishes need a wider strip-out.

Is the bathroom site survey charged?

Site surveys are charged, and the fee is deducted from the project value if the project goes ahead. The survey date is arranged after the brief.

How do payment and warranty work for bathroom renovation?

For construction projects: 30% down payment at contract, then billing at each 25% of physical progress. Structure warranty 5 years; finishes and installations 2 years.

Tell us about your project

Send us the location, the type of work and a rough budget, and we'll help you with the next step. WhatsApp 0811-1532-118.

Chat on WhatsApp