Components

Aluminium Frame Installation

Standard

Aluminium frames per linear metre, material and installation.

From · Standard

IDR 1,050,000 / m²

Premium IDR 2,000,000 · Signature IDR 4,500,000 / m²

e.g. 8 m² ≈ IDR 8,400,000 (Standard)

Discuss Project
Aluminium Frame Installation

Aluminium Frame Installation

Aluminium Window/Door Frame Installation is a standar komponen concept designed for practical, refined use. The proposal balances functional planning, realistic materials, lighting, circulation, and buildability.

Dimensions, finishes, specifications, and scope can be adapted to the actual site and project requirements. The displayed estimate is an initial reference only; final pricing depends on consultation, site verification, existing conditions, quantities, specifications, and MEP requirements.

Warranty & payment

Warranty

  • 2yrs

    Workmanship & installation

    Defects from our workmanship or installation are repaired at no cost.

  • Factory

    Manufactured products

    Sanitaryware, lights, pumps, AC units, and other appliances follow the manufacturer's warranty.

Counted from handover. Excludes damage from misuse, natural disasters, or changes by other parties. Full terms are set out in the contract.

Payment terms

Down payment at contract50%
Balance on completion50%

50% down payment at contract, 50% when the work is complete.

Often added together

Standard price per unit. Choose tier and quantity when adding.

How it works

This design is a starting point. MEETS adapts the specifications and delivery to your project needs.

  1. 01

    Consultation

    We understand your needs, space function, budget, and project expectations.

  2. 02

    Site visit

    Our team reviews actual site conditions: size, access, utilities, and factors that affect design and cost.

  3. 03

    Design adjustment

    Design, specifications, and scope of work are adapted to your land and requirements.

  4. 04

    Final proposal

    We prepare a quote covering the work, specifications, price, timeline, and project terms.

  5. 05

    Construction

    Work proceeds according to the design, scope, specifications, and agreement through handover.

From

IDR 1,050,000/ m²