Houses
Tropical Gable
Modern Tropical Contemporary
A modern tropical contemporary single-storey house with a distinctive gable roof, 2 bedrooms, and 1 bathroom.
Ready to live from
IDR 320,000,000
Core from IDR 224,000,000
Excludes 11% VAT, add-ons, and special site conditions (land filling or raising). Final price after a site visit.

- 64m²
- AreaBuilding area
- 2
- BedsBedrooms
- 1
- BathsBathrooms
- 1
- FloorsFloors
- 8×8,5
- LandLand
Overview
Tropical Gable is a full-house concept in the MEETS catalogue. Recorded building area: 64 m². Programme: 2 bedrooms, 1 bathroom, 1 floor. Style noted in the catalogue: Modern Tropical Contemporary. Category: Residential.
Tropical Gable
Tropical Gable is a single-storey house concept in the Modern Tropical Contemporary style, featuring a distinctive gable roof as its main architectural character. The house includes 2 bedrooms, 1 bathroom, a living room, family room, kitchen, prayer room, and laundry area.
Floor plans
Choose a package
Frame material
Estimated build cost
IDR 320,000,000
about IDR 5,000,000/m²
Included
- Core: foundations, concrete structure, plastered and skimmed brick walls, light-steel roof frame with sand-coated metal roofing
- Standard finishing — materials as listed above
- 1 complete bathroom package
- Kitchen package (counter + sink)
- House utilities (septic, tank, pump, panel)
Bonus
- House design
- PBG permit processing
Not included
- Kitchen set (upper + lower)
- Built-in wardrobe
- Split air conditioner
- Water heater
- Carport canopy
- Front fence & gate
- Swimming pool
- Landscape & garden
- Furniture
Cost summary by work item
Standard · Aluminium
| No. | Work item | % | Amount |
|---|---|---|---|
| I. | Site preparation | 3.8% | IDR 12,253,000 |
| II. | Earthworks & foundation | 15.5% | IDR 49,504,000 |
| III. | Concrete structure & stairs | 14.2% | IDR 45,450,000 |
| IV. | Walls, plaster & facade | 29.3% | IDR 93,753,000 |
| V. | Roof frame & covering | 10.0% | IDR 31,853,000 |
| VI. | Floors & tiling | 5.2% | IDR 16,493,000 |
| VII. | Frames, doors & windows | 6.8% | IDR 21,792,000 |
| VIII. | Ceilings | 2.6% | IDR 8,246,000 |
| IX. | Painting | 3.0% | IDR 9,754,000 |
| X. | Sanitary, kitchen & plumbing | 7.1% | IDR 22,800,000 |
| XI. | Electrical & lighting | 2.5% | IDR 8,102,000 |
| Total | 100.0% | IDR 320,000,000 |
Indicative breakdown of the package price, based on work quantities for this design and 2026 unit rates. The detailed BoQ follows after the site visit.
Warranty & payment
Warranty
5yrs
Structure
Foundations, columns, beams, slabs, and roof framing we build.
2yrs
Finishes & installations
Floors, walls, ceilings, paint, frames, electrical and plumbing installations.
Factory
Manufactured products
Sanitaryware, lights, pumps, AC units, and other appliances follow the manufacturer's warranty.
Counted from handover. Excludes damage from misuse, natural disasters, or changes by other parties. Full terms are set out in the contract.
Payment terms
Standard · Aluminium
| Down payment at contract | 30% | IDR 96,000,000 |
| 25% physical progress | 17.5% | IDR 56,000,000 |
| 50% physical progress | 17.5% | IDR 56,000,000 |
| 75% physical progress | 17.5% | IDR 56,000,000 |
| 100% progress · handover | 17.5% | IDR 56,000,000 |
| Total | 100% | IDR 320,000,000 |
|---|
30% down payment at contract. After that you're billed at every 25% of physical progress; the down payment is deducted evenly from each billing (25% − 7.5% = 17.5%).
Estimated pricing only. Final pricing will be confirmed after consultation, site assessment, measurements, specifications and final material selections.
Not ready to build yet? Buy the design.
Get the design files for this house. If you build with MEETS within 12 months, the full price is deducted from your contract.
- Buy Concept Pack
Concept Pack
IDR 1,500,000
- PDF floor plans (all floors)
- PDF elevations & sections
- 3D renders (SketchUp)
- Buy Complete Pack
Complete Pack
IDR 5,500,000
- Everything in the Concept Pack
- AutoCAD files (DWG)
- SketchUp files (SKP)
Licensed for one build at one location. Payment by invoice and bank transfer; files are sent after payment is confirmed. Adapting the design to your land and permits (PBG) is not included.
Questions about Tropical Gable
How much does it cost to build Tropical Gable?
For 64 m², the early estimate for Tropical Gable is IDR 224,000,000 for Core (structure, walls and roof, no finishing), IDR 320,000,000 for Standard, IDR 365,000,000 for Premium and IDR 480,000,000 for Signature. Standard works out to about IDR 5,000,000/m². The final price follows the site visit and agreed specification.
What rooms does Tropical Gable have?
Tropical Gable has 2 bedrooms, 1 bathroom and a 9 m² covered terrace across 1 floor.
How long does it take to build Tropical Gable?
Roughly 3–4 months for 64 m² over 1 floor, from site preparation and foundations to handover. The detailed schedule is set after the site visit.
What's the difference between Standard and Premium for Tropical Gable?
Foundations, structure and walls are the same; Premium upgrades the roof covering and finishes such as floors, sanitary ware, doors and windows, ceilings and paint. For Tropical Gable the difference is IDR 45,000,000.
Can I buy the Tropical Gable design only?
Yes. The Concept Pack (PDF plans, elevations, sections and 3D renders) is IDR 1,500,000, and the Complete Pack (adds AutoCAD DWG and SketchUp SKP files) is IDR 5,500,000. If you build with MEETS within 12 months, the full price is deducted from the contract.
Complete your home
Standard price per unit. Choose tier and quantity when adding.
How it works
This house concept is a starting point. MEETS adapts the design and build to your land and requirements.
01
Consultation
We understand your needs, space function, budget, and project expectations.
02
Site visit
Our team reviews actual site conditions: size, access, utilities, and factors that affect design and cost.
03
Design adjustment
Design, specifications, and scope of work are adapted to your land and requirements.
04
Final proposal
We prepare a quote covering the work, specifications, price, timeline, and project terms.
05
Construction
Work proceeds according to the design, scope, specifications, and agreement through handover.









