Lighting and Electrical Refresh
40m²
Area
2–5
Estimated duration

Overview

Lighting and Electrical Refresh is a renovation package in the MEETS catalogue. Recorded building area: 40 m². Style noted in the catalogue: Contemporary. Category: Systems. Price shown on this page: IDR 125,000 / point.

Lighting and Electrical Refresh

An electrical and lighting refresh for an existing house. The scope covers light points, switches, and strengthening circuits to suit the need. It suits a house that is dark at night, short of power points, or ready for lighting that is tidier and more efficient.

Warranty & payment

Warranty

  • 5yrs

    Structure

    Foundations, columns, beams, slabs, and roof framing we build.

  • 2yrs

    Finishes & installations

    Floors, walls, ceilings, paint, frames, electrical and plumbing installations.

  • Factory

    Manufactured products

    Sanitaryware, lights, pumps, AC units, and other appliances follow the manufacturer's warranty.

Counted from handover. Excludes damage from misuse, natural disasters, or changes by other parties. Full terms are set out in the contract.

Payment terms

Down payment at contract30%
25% physical progress17.5%
50% physical progress17.5%
75% physical progress17.5%
100% progress · handover17.5%

30% down payment at contract. After that you're billed at every 25% of physical progress; the down payment is deducted evenly from each billing (25% − 7.5% = 17.5%).

Often added together

Standard price per unit. Choose tier and quantity when adding.

How it works

This design is a starting point. MEETS adapts the specifications and delivery to your project needs.

  1. 01

    Consultation

    We understand your needs, space function, budget, and project expectations.

  2. 02

    Site visit

    Our team reviews actual site conditions: size, access, utilities, and factors that affect design and cost.

  3. 03

    Design adjustment

    Design, specifications, and scope of work are adapted to your land and requirements.

  4. 04

    Final proposal

    We prepare a quote covering the work, specifications, price, timeline, and project terms.

  5. 05

    Construction

    Work proceeds according to the design, scope, specifications, and agreement through handover.