Second-Floor Extension
Structural
Extend the house upward with a new upper floor.
From · Standard
IDR 5,500,000 / m²
Premium IDR 7,000,000 · Signature IDR 9,500,000 / m²
e.g. 40 m² ≈ IDR 220,000,000 (Standard)

- 20m²
- AreaBuilding area
- 5–10
- Estimated durationEstimated duration
Overview
Second-Floor Extension is a renovation package in the MEETS catalogue. Recorded building area: 20 m². Style noted in the catalogue: Structural. Category: Extension. Price shown on this page: IDR 5,500,000 / m².
Second-Floor Extension
An upper-floor addition: a structural review, new structure, and finishes on the new floor. It starts from the building you have, not from an empty site.
Warranty & payment
Warranty
5yrs
Structure
Foundations, columns, beams, slabs, and roof framing we build.
2yrs
Finishes & installations
Floors, walls, ceilings, paint, frames, electrical and plumbing installations.
Factory
Manufactured products
Sanitaryware, lights, pumps, AC units, and other appliances follow the manufacturer's warranty.
Counted from handover. Excludes damage from misuse, natural disasters, or changes by other parties. Full terms are set out in the contract.
Payment terms
| Down payment at contract | 30% |
| 25% physical progress | 17.5% |
| 50% physical progress | 17.5% |
| 75% physical progress | 17.5% |
| 100% progress · handover | 17.5% |
30% down payment at contract. After that you're billed at every 25% of physical progress; the down payment is deducted evenly from each billing (25% − 7.5% = 17.5%).
Often added together
Standard price per unit. Choose tier and quantity when adding.
How it works
This design is a starting point. MEETS adapts the specifications and delivery to your project needs.
01
Consultation
We understand your needs, space function, budget, and project expectations.
02
Site visit
Our team reviews actual site conditions: size, access, utilities, and factors that affect design and cost.
03
Design adjustment
Design, specifications, and scope of work are adapted to your land and requirements.
04
Final proposal
We prepare a quote covering the work, specifications, price, timeline, and project terms.
05
Construction
Work proceeds according to the design, scope, specifications, and agreement through handover.