Buildings & Facilities

Futsal & Multi-Sport Court

Technical

An outdoor futsal or multi-sport court with a ready-to-play sports floor.

From

IDR 630,000 / m²

per m² · indicative, outdoor floor + sub-base

Discuss Project
Futsal & Multi-Sport Court

Overview

Futsal & Multi-Sport Court is a building / facility package in the MEETS catalogue. Style noted in the catalogue: Technical. Category: Sports Facilities. Price shown on this page: From IDR 630,000 / m².

Futsal & Multi-Sport Court

A futsal and multi-sport court package for a community, school, or rental business. The estimate uses an indicative per-m² rate for an outdoor sports floor (synthetic grass or equivalent) with sub-base.

A covered hall, LED lighting, and changing rooms are priced separately as needed.

Estimates are indicative. The final price depends on the site, structure, and specifications.

Included scope

  • Court site preparation and levelling
  • Sub-base
  • Outdoor sports flooring
  • Basic line markings

Warranty & payment

Warranty

  • 5yrs

    Structure

    Foundations, columns, beams, slabs, and roof framing we build.

  • 2yrs

    Finishes & installations

    Floors, walls, ceilings, paint, frames, electrical and plumbing installations.

  • Factory

    Manufactured products

    Sanitaryware, lights, pumps, AC units, and other appliances follow the manufacturer's warranty.

Counted from handover. Excludes damage from misuse, natural disasters, or changes by other parties. Full terms are set out in the contract.

Payment terms

Down payment at contract30%
25% physical progress17.5%
50% physical progress17.5%
75% physical progress17.5%
100% progress · handover17.5%

30% down payment at contract. After that you're billed at every 25% of physical progress; the down payment is deducted evenly from each billing (25% − 7.5% = 17.5%).

Often added together

Standard price per unit. Choose tier and quantity when adding.

How it works

This design is a starting point. MEETS adapts the specifications and delivery to your project needs.

  1. 01

    Consultation

    We understand your needs, space function, budget, and project expectations.

  2. 02

    Site visit

    Our team reviews actual site conditions: size, access, utilities, and factors that affect design and cost.

  3. 03

    Design adjustment

    Design, specifications, and scope of work are adapted to your land and requirements.

  4. 04

    Final proposal

    We prepare a quote covering the work, specifications, price, timeline, and project terms.

  5. 05

    Construction

    Work proceeds according to the design, scope, specifications, and agreement through handover.

Gallery

From

IDR 630,000