Padel court contractor and outdoor sports-court construction: synthetic turf, glass walls, fencing, and basic lighting.
From
IDR 1,575,000 / m²
Indicative MEETS estimate about IDR 315M per outdoor court (10 × 20 m). Canopy not included. Final price after the site visit.

Overview
Padel Court Contractor is a building / facility package in the MEETS catalogue. Style noted in the catalogue: Technical. Category: Sports Facilities. Price shown on this page: From IDR 1,575,000 / m².
Padel Court Contractor
MEETS is a padel court contractor for outdoor venues. Scope for building a padel court covers synthetic turf flooring, glass walls and fencing, court lines, and basic lighting.
The estimate per m² is indicative. Final pricing follows the number of courts and specification after the site visit.
Related portfolio: Doo Space Padel MT Haryono (South Jakarta) and Doo Space Padel The Icon BSD (South Tangerang). See the padel court construction cost guide for a component breakdown.
Estimates are indicative. The final price depends on the site, structure, and specifications.
Included scope
- Site preparation and levelling
- Sub-base and slab
- Outdoor synthetic turf flooring
- Glass walls and fencing
- Court lines / markings
- Basic lighting
Warranty & payment
Warranty
5yrs
Structure
Foundations, columns, beams, slabs, and roof framing we build.
2yrs
Finishes & installations
Floors, walls, ceilings, paint, frames, electrical and plumbing installations.
Factory
Manufactured products
Sanitaryware, lights, pumps, AC units, and other appliances follow the manufacturer's warranty.
Counted from handover. Excludes damage from misuse, natural disasters, or changes by other parties. Full terms are set out in the contract.
Payment terms
| Down payment at contract | 30% |
| 25% physical progress | 17.5% |
| 50% physical progress | 17.5% |
| 75% physical progress | 17.5% |
| 100% progress · handover | 17.5% |
30% down payment at contract. After that you're billed at every 25% of physical progress; the down payment is deducted evenly from each billing (25% − 7.5% = 17.5%).
Often added together
Standard price per unit. Choose tier and quantity when adding.
How it works
This design is a starting point. MEETS adapts the specifications and delivery to your project needs.
01
Consultation
We understand your needs, space function, budget, and project expectations.
02
Site visit
Our team reviews actual site conditions: size, access, utilities, and factors that affect design and cost.
03
Design adjustment
Design, specifications, and scope of work are adapted to your land and requirements.
04
Final proposal
We prepare a quote covering the work, specifications, price, timeline, and project terms.
05
Construction
Work proceeds according to the design, scope, specifications, and agreement through handover.